婷婷成人丁香色情基地|精品国产AV午夜肉论影院|男女午夜久久久激情视频|在线视频乱码无遮挡|99久热re在线精品99r|五月天婷婷色亚洲丁香婷婷

在線咨詢0379-67399999

Installation

發(fā)布時間:2006-12-09 15:47:33
免費獲取報價 0379-6739 9999

The equipment after assembly is provided by manufacturer and check shall be carried out as soon as receiving product in order to avoid possible troubles during transportation.

1. It is suggested to install the equipment on concrete base to decrease vibration, noise and absorption of shock in order to avoid impact on building base. Adding ironwood, rubber belt or other buffer materials may as well.

2. Weight of base can be determined at 5-10 times of that of equipment and the depth of base shall be more than that of local frozen earth. Refer to the Base figure for locations of installing equipment and foundation bolt.

3. Before adjusting discharge door, release strain spring, and then adjust spring in order to prevent drop of ancon plate.

Leave a message

在線留言

免費提供設備報價、方案設計等服務,歡迎您隨時咨詢我們將第一時間給予回復!

我們會對您的個人隱私信息保密,請您放心!

0379-67399999

免費詢價

服務熱線 0379-6739 9999

獲取參數(shù)表 領取優(yōu)惠報價 預約實地考察 免費量身定制方案